“Influence of Buffer Size Change in Critical Chain Scheduling: Case Study ”. International Journal of Engineering Materials and Manufacture, vol. 6, no. 2, Apr. 2021, pp. 95-101, https://doi.org/10.26776/ijemm.06.02.2021.02.